How did the CMS buildings at Cambridge come to be built?

Updated

The Centre for Mathematical Sciences (CMS) buildings at Cambridge took shape through a documented planning and construction process that began with a 1997 feasibility study by Edward Cullinan Architects and proceeded through phased construction, with the site plan, approved plans, and move-in dates all recorded on the CMS website. The site itself (cms.cam.ac.uk) is the Centre's own information hub, and its history pages are the most direct source for how the buildings came to be.

Starting point: the 1997 feasibility study

The CMS history pages include extracts from a feasibility study dated 1997, prepared by Edward Cullinan Architects. That study is the earliest planning document referenced on the site and set out the design thinking behind the development. Related pages cover:

  • Planning requirements and suggestions — the constraints and recommendations that shaped the scheme.
  • An old plan showing the location — where the Centre would sit relative to the surrounding university buildings.
  • Surrounding architectural character — how the new buildings were meant to relate to their neighbours, with sections on "looking from within" and "looking from without."

Design and environmental approach

The design record is split into two parts: Environmental Design – Part I and Part II. These pages describe how environmental considerations were built into the scheme, alongside the architectural character analysis. Together they show that the design was developed with both the site's setting and its internal environment in mind, rather than as a single undifferentiated block.

Plans, phases, and approvals

The site documents the scheme at several levels of detail:

Page What it covers
Basements and Ground Floor Floor-level plans for the lower levels
Site Plan Overall layout of the development
Plans – downloads Downloadable plan files
Different Phases How the build was divided into stages
Approved Plans and Timetable The approved scheme and its schedule

The "Approved Plans and Timetable" page is the key reference for anyone tracing the formal approval and sequencing of the build.

Construction and the pavilions

Construction is documented through site photographs, including aerial photographs of the building site taken by Dr Barry Uscinski on 28 April 1999, a "Picture of the Week" series, and images of the CMS in snow in 1998. The scheme's components are recorded individually:

  • The Marit and Hans Rausing pavilion
  • Pavilion A, Pavilion C, and Pavilion D
  • Phase two
  • The Faulkes Gatehouse
  • The Betty and Gordon Moore Library and the Faulkes Institute for Geometry

Ceremonial milestones are also recorded: the groundbreaking ceremony, the topping out ceremony (and topping out of the Gatehouse), and the first public lecture in the central-core common room (Pavilion A), given by Grimmett.

Funding and the road to construction

The buildings depended on fundraising, and the site documents this openly. Pages cover funding and phasing, major benefactors, the Garfield Weston Foundation, and fundraising documents, along with press releases dated 21 April 1997 and 9 September 1996. Move-in dates and newsletters record when departments and occupants actually arrived.

Practical takeaways for researchers

If you are tracing the CMS build for a project, start with the feasibility study extracts and the approved plans and timetable, then use the phase and pavilion pages to map specific buildings to dates. The move-in dates page converts construction milestones into occupancy, which is often the detail missing from architectural summaries. Note that the site's "Plans" links refer to building plans, not pricing or booking information; the site does not present the CMS as a bookable venue.