artemistimeline.com
An interactive photo timeline of NASA's Artemis II mission — scrub through every crew moment, lunar flyby shot, and audio clip from April 1–10, 2026.
At a glance
- Category
- Development
- Language
- English
- Paid-content signal
- No paid content foundObserved
- Registered
- 2026
- Hosting
- VercelInferred
- HTTPS certificate trusted
- PassedObserved
- Last updated
Related questions
More questions →What is artemistimeline.com?
Does artemistimeline.com offer paid content?
What languages does artemistimeline.com support?
How can I visit artemistimeline.com?
What are some alternatives to artemistimeline.com?
Website Overview
Page metadata, canonical configuration and social previews work together to provide more consistent search and sharing presentation.
Domain and Registration
The domain was registered less than a year ago and has limited historical evidence to assess. Transfer-protection status is present, helping reduce the risk of unauthorized domain transfers. The domain uses the common .com extension, which is not an independent safety signal.
DNS and Email
The lowest TTL is 60 seconds, supporting rapid record changes at the cost of more frequent lookups. Nameservers are provided by vercel-dns.com, indicating managed DNS hosting. CAA records restrict which certificate authorities are authorized to issue certificates. No CNAME was found; the observed records resolve directly to addresses. No MX record was found. A conventional explicit inbound-mail route is not configured.
TLS and Certificates
The certificate uses an RSA 2048-bit public key, offering broad client compatibility. The server supplied a complete certificate chain. No organization name is present in the certificate; the available fields are consistent with domain validation. The certificate was issued by Let's Encrypt, commonly associated with automated certificate services. The certificate's total validity is about 89 days, consistent with a short renewal cycle.
HTTP and Browser Security
The response lacks these common security headers: CSP. CORS permits any origin to read this response. This is common for public resources; sensitive responses need narrower handling. No X-Powered-By header was found, reducing one common source of backend fingerprinting information. No obvious internal addresses or debug information were found in the headers. The Server header contains the custom value Vercel.
Technology Stack Analysis
The public page identifies Vercel without precise versions, leaving fewer clues for version-specific scanning.
Search and Social Sharing
Twitter Card metadata is configured. The title has 25 characters, within a common display range. A meta description is present, with 149 characters. The observed directives allow indexing and link following. No Generator meta tag is publicly exposed.
Hosting and Email
Registration details
| Registrar | Name.com, Inc. |
|---|---|
| Registered | 2026-04-12 |
| Expires | 2027-04-12 |
| Domain status | client transfer prohibited |
| Nameservers | ns1.vercel-dns.com、ns2.vercel-dns.com |
| DNSSEC | unsigned |
DNS records
| Type | Name | Value | TTL | Priority |
|---|---|---|---|---|
| A | artemistimeline.com | 216.150.1.193 | 1800 | — |
| A | artemistimeline.com | 216.150.1.65 | 1800 | — |
| NS | artemistimeline.com | ns1.vercel-dns.com | 86400 | — |
| NS | artemistimeline.com | ns2.vercel-dns.com | 86400 | — |
| TXT | artemistimeline.com | google-site-verification=ZoYxd5H7BJ56kySo8AQp7O7Oby_Bwkg1m9mEj09OwfI | 60 | — |
| CAA | artemistimeline.com | 0 issue "letsencrypt.org" | 60 | — |
| CAA | artemistimeline.com | 0 issue "pki.goog" | 60 | — |
| CAA | artemistimeline.com | 0 issue "sectigo.com" | 60 | — |
TLS and certificates
HTTP response headers
| Header | Value |
|---|---|
| content-type | text/html; charset=utf-8 |
| cache-control | public, max-age=0, must-revalidate |
| server | Vercel |
| strict-transport-security | max-age=63072000 |
| x-frame-options | DENY |
| x-content-type-options | nosniff |
| referrer-policy | strict-origin-when-cross-origin |
| permissions-policy | camera=(), microphone=(), geolocation=() |
| access-control-allow-origin | * |
Identified technologies
Pages, Search and Sharing
| Meta description | An interactive photo timeline of NASA's Artemis II mission — scrub through every crew moment, lunar flyby shot, and audio clip from April 1–10, 2026. |
|---|---|
| Canonical URL | https://artemistimeline.com/ |
| Language | English (default) |
| Twitter Card | summary_large_image |
Social Sharing Preview
10 fieldsrobots.txt (opens in a new tab)
1 rulesAll bots 1 allowed · 0 disallowed
- Allow
/
No matching rules.
User reviews (0)