Website profiles · Technology insights · Alternatives

b9energy.co.uk

The B9 group develops renewable energy from Larne, County Antrim: landfill gas power, food waste collection, and hydrogen and green methanol for Irish Sea ferries. Solar is installed by B9 Renewables.

No paid content found
Visit website
Profile views 16 Outbound visits 20 Normal
B9 Energy Full homepage screenshot

At a glance

Category
Industry & Manufacturing
Language
English
Paid-content signal
No paid content foundObserved
Registered
1997
Hosting
Amazon CloudFrontInferred
HTTPS certificate trusted
PassedObserved
Last updated

Website review

This review may include AI-generated content and is not individually verified. Domain, certificate and other facts come from the observed data on this page.

What is B9 Energy?

B9 Energy is a renewable energy group based in Larne, County Antrim, Northern Ireland, active since 1992. It develops, builds and operates projects across several low-carbon areas rather than specialising in one technology.

Its work spans:

  • Landfill gas and biogas — gas engines at seven Northern Ireland landfill sites, run by B9 Energy Control, plus food waste collection through B9 Food Recovery.
  • Solar and electrification — panels, batteries and EV chargers for homes and businesses, installed by B9 Renewables.
  • Power-to-X and maritime fuel — green hydrogen and e-methanol intended as low-carbon fuel for Irish Sea freight ferries, including the NI/GB Green Shipping Corridor project.
  • Consultancy — greenhouse gas reporting, emission-reduction plans and renewable energy assessments for SMEs and larger companies.
  • Historic wind work — ten wind farms developed with RES and a wind operations and maintenance business between 1992 and 2015.

The group's current emphasis is on maritime decarbonisation: the Larne Harbour Power-to-X trial site reached the end of its feasibility phase in 2025, and methanol reformer equipment has been arriving for pre-deployment trials.

Who it suits: a Northern Ireland business wanting solar, battery storage or EV charging installed; a food business needing waste collection; or a company needing emissions reporting and reduction planning. Shipping and fuel-sector readers are more likely to follow the hydrogen and methanol projects.

A practical next step: decide which side of the business matches your need, since domestic and commercial solar enquiries go through B9 Renewables while waste and gas operations sit with separate group companies. If your interest is the shipping fuel work, look at the project pages rather than the installation services, because those efforts are still in development rather than available to buy. You can see the full picture at B9 Energy.

How does B9 Energy produce green methanol for Irish Sea ferries?

B9 Energy's green methanol work is a Power-to-X project, not a fuel already being sold to ferries. The intended chain is: renewable electricity powers an electrolyser to make green hydrogen; captured CO₂ is combined with that hydrogen to produce e-methanol; the liquid fuel is then aimed at freight ferries on the Irish Sea, including via the NI/GB Green Shipping Corridor.

Where each step stands

  • Hydrogen: In development. The Ballylumford Power-to-X project near Larne is described as producing green hydrogen with renewable power, using a Flowfield electrolyser.
  • CO₂ supply: The group works on carbon capture (CCUS) technologies; the methanol step calls for captured CO₂.
  • Methanol production: In development. A methanol reformer has arrived for pre-deployment trials, and the Larne Harbour Maritime Power-to-X trial site reached the end of its feasibility phase in 2025.
  • End use: In development. The target is low-carbon fuel for green shipping routes, with the Irish Sea freight ferry route as the focus.

What this means in practice

For a ferry operator, e-methanol only works if three things line up: enough renewable power, a steady stream of captured CO₂, and bunkering at the right ports. A Larne-based trial site is well placed for Irish Sea routes, but the fuel must still be produced at scale and delivered shipside. Anyone tracking this should watch the trial site's progress from feasibility into operation, and whether an actual ferry route commits to the fuel.

Next step

If you want the project specifics rather than the general concept, start with the group's own project pages at B9 Energy. For a wider view of maritime e-methanol, the Port of Larne's owner and the NI/GB Green Shipping Corridor partners are the organisations to follow; the corridor itself is the clearest signal of when Irish Sea ferries might actually run on this fuel.

What landfill gas and food waste services does B9 Energy offer in Northern Ireland?

B9 Energy handles landfill gas and food waste as two linked parts of its renewable-energy business in Northern Ireland. The landfill gas side is operational rather than experimental: gas engines at seven Northern Ireland landfill sites are run by B9 Energy Control, turning methane that would otherwise escape from decomposing waste into electricity. The food waste side sits with B9 Food Recovery, which collects food waste — the organic material that can be digested to produce biogas (anaerobic digestion) rather than sent to landfill.

In practical terms, that combination matters because it covers both ends of the problem: capturing gas from waste already buried, and diverting new food waste into digestion so less methane is generated in the first place.

Who each service suits

  • Landfill gas – landfill operators and site owners in Northern Ireland who need gas engines operated and maintained, and who want a proven route to convert existing methane emissions into power.
  • Food waste collection – businesses and organisations with regular food waste, such as food manufacturers, hospitality, retail and public-sector sites, that need a collection service and a documented diversion-from-landfill route.

A concrete scenario

A hotel or canteen generating several tonnes of food waste a week could use B9 Food Recovery for collection, while a nearby landfill operator uses B9 Energy Control for gas engines. Both feed into the same idea of extracting energy from organic waste, which also supports greenhouse gas reporting and emission-reduction planning — an area where B9 offers consultancy.

How to decide

If your waste is already in the ground at a landfill site, the relevant service is landfill gas power operation. If your waste is being produced daily in kitchens or processing lines, ask about food waste collection and anaerobic digestion. If you need both plus reporting, the group's consultancy can tie the strands together.

Next step: contact B9 Energy at its Larne base to confirm coverage for your site and waste volumes, and ask specifically whether collection rounds serve your area. For context on the wider Northern Ireland renewables sector, see B9 Energy.

Can B9 Renewables install solar panels and EV chargers for my home or business?

Yes. B9 Renewables, part of the B9 Energy group based in Larne, County Antrim, installs solar panels, batteries and EV chargers for homes and businesses across Northern Ireland. The group's own description lists this as one of its current activities, separate from its larger landfill gas, hydrogen and green methanol work.

What that means in practice

  • For a home: a typical job would be roof-mounted solar, an inverter, a battery for storing daytime generation, and an EV charger so you can charge from your own roof rather than the grid.
  • For a business: the same components at commercial scale, often on a larger roof or site, where the case rests on daytime load — refrigeration, machinery, offices, or a fleet charged on site.
  • Why one contractor matters: solar, battery and charger sizing interact. A battery sized for evening household use is not the same as one sized to shave a business's peak demand, and the charger's rating affects how much of your generation you can actually use. Buying all three from one installer avoids two suppliers blaming each other when the system underperforms.

How to decide whether to go ahead

  1. Get your last 12 months of electricity bills — units used and, for a business, the maximum demand and tariff structure.
  2. Ask for a generation estimate for your specific roof: orientation, pitch, shading and how much of the roof is usable.
  3. Ask what share of generation the proposal assumes you will use on site versus export, and what export payment is assumed. Self-consumption is where most of the value sits.
  4. For EV charging, confirm whether you want a 7 kW home unit or a faster three-phase commercial unit, and whether you need load management so charging does not trip your supply.
  5. Check what happens at the end: monitoring, warranty terms for panels, inverter and battery separately, and who you call if a fault appears in year three.

A concrete scenario

A farm or small food business near Ballymena with a large south-facing shed roof, cold-store load running through the day, and two vans that return by early evening is close to the ideal case: generation and demand overlap, the battery covers the evening peak, and the chargers soak up surplus. A shaded terraced house with low daytime use and one car driven rarely is a weaker case — the panels still work, but the payback depends far more on export rates and battery cost.

Next step

Ring B9 Energy on the number published on their site and ask specifically for the B9 Renewables team, then request a site survey rather than a phone quote. If you want to compare, the group's own page is at B9 Energy. For an independent view of installer certification and consumer protection in the UK, the relevant schemes are run by MCS for product and installer standards, and you can check registered installers through MCS Certified.

What is the Ballylumford Power-to-X project and when will it be operational?

Ballylumford Power-to-X is a B9 Energy project near Larne, County Antrim, that aims to produce green hydrogen using renewable power. The hydrogen is intended for two linked uses: as a low-carbon fuel in its own right and as an input, together with captured CO₂, to make e-methanol — a liquid fuel for maritime shipping. It sits within B9's wider Power-to-X and shipping work, including the NI/GB Green Shipping Corridor, which targets freight ferries on the Irish Sea.

On timing, the supplied material describes the project as "in development." A related milestone is noted at the Larne Harbour Maritime Power-to-X pre-deployment trial site, where the feasibility phase ended in 2025; e-methanol pre-deployment trials involve methanol reformer equipment. The site does not give a firm operational date, so treat any specific start year as unconfirmed.

If you need to plan around it — for example, as a port authority, ferry operator, fuel buyer or local supplier — ask B9 directly for the current project schedule, the intended output capacity, and whether fuel will be sold commercially or used first in demonstration trials. You can start from B9 Energy and its project pages, and compare the wider context of UK hydrogen and maritime fuel development through GOV.UK.

How can I contact B9 Energy for a renewable energy consultancy or project enquiry?

Call B9 Energy on 028 2826 8273, or use the Contact us link on B9 Energy. The site also lists a contact route alongside its project pages, which is the better path if your enquiry is about a specific project rather than general consultancy.

Before you get in touch, it helps to know which part of the group your enquiry belongs to, since B9 is a group of related businesses rather than a single service desk:

  • Consultancy — greenhouse gas reporting, emission-reduction plans and renewable energy assessments for SMEs and larger companies. This is the right route for a consultancy enquiry.
  • B9 Renewables — solar panels, batteries and EV chargers for homes and businesses across Northern Ireland. Use this for a domestic or commercial installation quote.
  • B9 Energy Control — landfill gas operations; B9 Food Recovery — food waste collection. Relevant if you are a site operator or waste producer.
  • Power-to-X, hydrogen, e-methanol and maritime fuel projects — these are development-stage and partnership-led, so expect a slower, more technical conversation than a standard consultancy request.

A practical next step: write a short brief before you call. State your site or organisation, whether you want a feasibility assessment, emissions reporting or an installation, and any deadlines or funding milestones. For a consultancy enquiry, mention the scope (for example, a single site's carbon footprint versus a group-wide reduction plan) and whether you already hold energy or emissions data. That lets them route you to the right team on the first call instead of transferring you later.

If your enquiry concerns the Irish Sea green shipping or hydrogen work, ask specifically about the relevant project rather than consultancy in general — those are partnership and trial-stage activities, and the useful contact is likely the project team, not the general line.

Related questions

More questions →
What is b9energy.co.uk?
The B9 group develops renewable energy from Larne, County Antrim: landfill gas power, food waste collection, and hydrogen and green methanol for Irish Sea ferries. Solar is installed by B9 Renewables.
Does b9energy.co.uk offer paid content?
Unknown.
What languages does b9energy.co.uk support?
Primary language: English.
How can I visit b9energy.co.uk?
Use the Visit website link to open the website in a new tab.
What are some alternatives to b9energy.co.uk?
Related websites include zxaf.com, zebra.com, zaytran.com, yupack.com, yc-capacitor.com, xylem.com. Compare their features and pricing for your needs.

Website Overview

An established domain and managed infrastructure suggest continuity of operations and may support dependable delivery, although neither guarantees service quality. Several search or sharing settings need attention. Together they may make snippets, preview images or preferred URLs less consistent across platforms.

Domain and Registration

Registered in 1997, this domain has about 29 years of history. That suggests continuity, although ownership and purpose may have changed. The registrar is Namecheap, Inc., a widely used domain service provider. Registration contact information is publicly available through RDAP. The domain uses the common .uk extension, which is not an independent safety signal.

DNS and Email

The observed email authentication setup is incomplete: DMARC is missing. The lowest TTL is 60 seconds, supporting rapid record changes at the cost of more frequent lookups. Nameservers are provided by Amazon Route 53, indicating managed DNS hosting. DNS and provider evidence indicate traffic passes through the Amazon CloudFront CDN, which may support caching and traffic distribution. MX records point to the Microsoft 365 email service.

TLS and Certificates

The certificate uses an RSA 2048-bit public key, offering broad client compatibility. The server supplied a complete certificate chain. No organization name is present in the certificate; the available fields are consistent with domain validation. The certificate was issued within the Amazon cloud or CDN ecosystem. The certificate is valid for about 198 days in total, with 195 days remaining.

HTTP and Browser Security

The checked browser-security headers were not detected, leaving fewer explicit browser-side safeguards. No X-Powered-By header was found, reducing one common source of backend fingerprinting information. The x-cache, via response header indicates a CDN or caching proxy in the delivery path. No obvious internal addresses or debug information were found in the headers. No CORS permission header was found, so browsers normally restrict cross-origin script access.

Technology Stack Analysis

The public page identifies Next.js, Amazon CloudFront without precise versions, leaving fewer clues for version-specific scanning.

Search and Social Sharing

The meta description has 200 characters and may be shortened in search results. The canonical URL points to another host: https://b9energy.co.uk. Search engines may consolidate indexing signals there. Twitter Card metadata is configured. JSON-LD includes Organization data, helping describe the organization as an entity. The title has 49 characters, within a common display range.

Hosting and Email

DNSAmazon Route 53
HostingAmazon CloudFront
EmailMicrosoft 365
Approximate IP geolocation (inferred; a CDN or proxy may differ from the origin server) United States flagUnited States Inferred 3.170.3.103

Registration details

RDAP / WHOIS

RegistrarNamecheap, Inc.
Registered1997-08-11
Expires2027-08-11
Domain statusactive
Nameserversns-1429.awsdns-50.org、ns-1815.awsdns-34.co.uk、ns-470.awsdns-58.com、ns-977.awsdns-58.net
DNSSECunsigned

DNS records

DNS

TypeNameValueTTLPriority
Ad2odc3fq2je4qd.cloudfront.net3.170.3.10360—
Ad2odc3fq2je4qd.cloudfront.net3.170.3.12360—
Ad2odc3fq2je4qd.cloudfront.net3.170.3.1460—
Ad2odc3fq2je4qd.cloudfront.net3.170.3.2960—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:200:19:b5aa:9d40:93a160—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:9400:19:b5aa:9d40:93a160—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:9e00:19:b5aa:9d40:93a160—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:aa00:19:b5aa:9d40:93a160—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:ac00:19:b5aa:9d40:93a160—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:b400:19:b5aa:9d40:93a160—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:b600:19:b5aa:9d40:93a160—
AAAAd2odc3fq2je4qd.cloudfront.net2600:9000:286a:ba00:19:b5aa:9d40:93a160—
MXb9energy.co.ukb9energy-co-uk.mail.protection.outlook.com36000
NSb9energy.co.ukns-1429.awsdns-50.org172800—
NSb9energy.co.ukns-1815.awsdns-34.co.uk172800—
NSb9energy.co.ukns-470.awsdns-58.com172800—
NSb9energy.co.ukns-977.awsdns-58.net172800—
TXTb9energy.co.ukv=spf1 +a +mx +ip4:82.145.60.252 +ip4:82.145.60.186 +ip4:82.145.60.211 +include:spf.protection.outlook.com -all3600—
CNAMEwww.b9energy.co.ukd2odc3fq2je4qd.cloudfront.net500—

TLS and certificates

TLS / SSL

AssessmentNormal configuration
Supported protocolsTLSv1.2、TLSv1.3
Negotiated protocolTLSv1.3
Certificate subject*.b9energy.co.uk
IssuerAmazon
Valid until2027-04-10T18:31 · Remaining when checked: 195 days
Verification detailsCertificate trust: Passed · Hostname match: Passed

HTTP response headers

HTTP

HeaderValue
content-typetext/html; charset=utf-8
cache-controls-maxage=31536000

Identified technologies

Next.jsAmazon CloudFront

Pages, Search and Sharing

Meta descriptionThe B9 group develops renewable energy from Larne, County Antrim: landfill gas power, food waste collection, and hydrogen and green methanol for Irish Sea ferries. Solar is installed by B9 Renewables.
Canonical URLhttps://b9energy.co.uk
LanguageEnglish (default)
Twitter Cardsummary_large_image
All bots 1 allowed · 0 disallowed
  • Allow/

User reviews (0)

  • No reviews yet.