Website profiles · Technology insights · Alternatives

djc.com

Paid content
Visit website
Profile views 0 Outbound visits 0 Normal
Seattle DJC.com local business news and data Full homepage screenshot

At a glance

Category
News
Language
English
Paid-content signal
Paid contentObserved
Registered
1994
Hosting
Level 3 Parent, LLCInferred
HTTPS certificate trusted
PassedObserved
Last updated

Website review

This review may include AI-generated content and is not individually verified. Domain, certificate and other facts come from the observed data on this page.

What is Seattle DJC.com?

Seattle DJC.com is the online home of the Daily Journal of Commerce, a Pacific Northwest business publication focused on construction, real estate, architecture and engineering, and public-sector procurement. Its core value is practical: bid notices, RFPs and RFQs, planholder lists, building permits, project awards, and firm directories, alongside local business news. It serves contractors, subcontractors, design firms, suppliers, and owners who need to find work or track competitors in the region.

What you'll find there

  • Bidding and RFP tools: bid calendars, sub-bid requests, rosters, and federal project listings.
  • Plancenter: a place to upload plans and register your firm as a planholder.
  • Directories and data: firm directories, building permits, liens, and property sales.
  • News and features: project spotlights, people moves, and special sections.
  • Subscriptions: online, newspaper, and plancenter options, plus a free weekly newsletter.

Who it's for, and the trade-off

A subcontractor in Tacoma can scan the bid center for upcoming work and check who else is bidding; an architecture firm can watch early-stage project notices. The trade-off is that much of the detail sits behind a subscription, and the site is dense and utilitarian rather than a polished news magazine. If you only need occasional headlines, the free newsletter may be enough; if you bid regularly, the paid tiers and plancenter access are the reason to be there.

How can I find construction bids and RFPs for Pacific Northwest projects on DJC.com?

DJC.com organizes its construction bid and RFP coverage into a few distinct sections, and the right entry point depends on whether you want to find projects, track results, or get on a planholder roster.

Where to look

  • Bid Center / Bidding & RFP Center: The main hub for construction bids, IFBs, sub-bid requests, RFPs, SOQs, and rosters. Start here if you're a contractor or subcontractor scanning for open opportunities.
  • Today's bid results and Bid Calendar: Use these to see what has already been awarded and what is coming up, which helps with pipeline planning rather than immediate bidding.
  • Upcoming Projects and Project of the Week: Useful for early intelligence on work that hasn't formally advertised yet.
  • Plancenter: DJC's plan room, where plans and specifications for Pacific Northwest projects are posted. Firms can add themselves as planholders and upload plans.
  • Building Permits and Federal Projects: Permit listings can surface work before it reaches the bid stage, and the federal section covers agency solicitations separately.
  • Consultant Services and Misc. Goods & Services: Separate listings for A&E bids, RFPs, and SOQs, plus non-construction procurements.

A practical approach

If you're a subcontractor, check the Bid Center for sub-bid requests first, then register as a planholder on Plancenter so general contractors can find you. If you're a general contractor or consultant, set up searches in MyDJC and review the Bid Calendar weekly so upcoming advertisements don't surprise you. Public agencies and firms publishing notices can place legal notices through DJC's notice service.

For broader regional coverage, compare with Builders Exchange or the daily construction press in your state; DJC's strength is its concentrated Pacific Northwest focus across Washington, Oregon, and Idaho.

What subscription options does DJC.com offer for the newspaper, online access, or plancenter?

DJC.com separates its paid offerings into three tracks: the print newspaper, online access, and Plancenter. The site's subscription section lists "Subscribe / Renew" for "the DJC online, newspaper or plancenter.com," so these are treated as distinct choices rather than one bundled product. Exact rates and what each tier includes are not shown here; check the subscription page for current terms and the subscription agreement for conditions.

Who each option suits

  • Print newspaper: Readers who want the physical edition and prefer reading away from a screen. It fits those tracking regional business and construction news at a slower pace.
  • Online access: The practical choice for daily monitoring. The site organizes content into sections such as Construction, Real Estate/Credit, Environment, Tech, and Money, plus bid results, building permits, and firm directories—useful for someone checking opportunities or awards regularly.
  • Plancenter: Aimed at contractors, subcontractors, and suppliers who need plans and specifications for Pacific Northwest projects. Its functions include adding your firm as a planholder and uploading plans to Plancenter, which matters if you want to appear on rosters or distribute documents.

A free weekly newsletter is also offered, which can serve as a low-commitment way to sample coverage before paying.

How to choose

Start from your workflow. If you bid on public work, Plancenter's planholder and roster features are the deciding factor; if you mainly follow news and bid results, online access covers it; choose print only if you genuinely read the paper edition. A sensible next step is to open the Subscribe / Renew page, compare what each option includes, and read the subscription agreement before committing—then use the free newsletter to test whether the coverage matches your market.

How do I place a legal or public notice in the DJC?

Place it through the DJC's "Publish a Notice" service, which is listed under DJC Services in the site's navigation; that is the entry point for legal and public notices rather than the general news sections. The same area of the site also handles classified advertisements, so choose the notice option if your text is a formal legal or government notice.

What to prepare before you start

  • Notice text: the exact wording, including any statutory language your jurisdiction requires.
  • Publication dates: the deadline and any required run dates, since legal notices often must appear a set number of times before a hearing or bid opening.
  • Proof of publication: decide in advance who should receive an affidavit or tear sheet, if one is needed.
  • Contact and billing details: the person the DJC should reach with questions or proofs.

Choosing the right placement

DJC's notice categories include legal notices, government notices and city notices, alongside construction bid calls, RFPs and rosters. A county or city publishing a hearing notice belongs in the government or city notice category; a contractor or owner publishing a bid advertisement belongs with the bidding and RFP notices. Getting this right matters because readers browse by category, and the wrong one can mean the notice reaches fewer of the people you need.

For a practical example: a city planning department with a hearing 21 days out should confirm the required run dates first, submit the notice text with the hearing date and docket number, then check the published version against the original before the first run closes. Errors in a legal notice can require a re-publication at your cost.

As a next step, open the Publish a Notice page and note the submission instructions and deadlines before drafting, since closing times for the next print edition may be earlier than you expect.

What types of local business news and data does DJC.com cover, such as real estate, permits, and liens?

DJC.com is a Pacific Northwest construction and commercial-real-estate information service rather than a general city newspaper. Its core coverage is organized around the building trades: bid and RFP notices, planholder and roster listings, building permits, project awards, and public and legal notices. Real estate appears through top property sales, foreclosures, liens, and contract acceptances. It also carries business licenses, firm directories for contractors and consultants, event and people listings, and special sections.

Who gets the most from it

Reader Most relevant sections Practical use
General contractor or subcontractor Bid Center, sub-bids requested, plancenter plans and specs, bid calendar Find projects to price and see who else is bidding
Specialty trade or supplier Rosters, firms directory, building permits Spot jobs early and identify active builders
Architect or engineer A & E bids, RFPs and SOQs, consultant services Track public-sector design opportunities
Developer, broker, or lender Top property sales, liens, foreclosures, contract acceptances Follow distress, sales activity, and who is financing or building
Small local business Business licenses, people, events See new entrants and market movement

A useful next step

If you are chasing work rather than reading news, start with the Bid Center and plancenter listings and register your firm as a planholder. If you are tracking competitors or credit risk, the liens, foreclosures, and permit listings give earlier signals than finished project stories. Much of the site sits behind a subscription or sign-in, so decide which of those two workflows you need before subscribing.

For broader regional business context, The Seattle Times and American City Business Journals cover general business news, while DJC's value is the project-level detail those outlets rarely publish.

How can I add my firm to the DJC planholder list or upload plans to plancenter.com?

The DJC site offers a Plans function for exactly this: adding your firm as a planholder and uploading a plan to plancenter.com. Both actions are grouped under the "Plans" link in the site's services area, alongside the Plan Center and subscription options.

How to proceed

  1. Open the "Plans" link on Seattle DJC.com and choose the option to add your firm as a planholder.
  2. If you need to post documents, use the "Upload a plan to plancenter" option in the same area.
  3. For access to plan sets and specifications, the Plan Center covers Pacific Northwest projects; subscription details for the online edition, newspaper or Plan Center are listed on the site's subscription page.

What to expect

Planholder listing is mainly a visibility step: it signals to general contractors and subcontractors that your firm is pursuing a project, which can prompt bid invitations and sub-bid requests. Uploading plans is a distribution step, aimed at firms that need the drawings and specs. Treat them as separate tasks and confirm which one your firm actually needs before starting.

A practical example: a specialty subcontractor eyeing a school renovation would add itself as a planholder to appear on the roster, while an architecture firm issuing a new package would upload the plan set. If you are unsure which path applies, check the project's bid documents first, since some solicitations require planholder registration to receive addenda.

For context on regional bid activity, trade coverage such as Engineering News-Record can help you gauge which project types are active, though planholder registration itself happens through DJC.

Related questions

More questions →
What Business and Public Records Data Does Seattle DJC.com Offer?

Seattle DJC.com (the Daily Journal of Commerce) publishes four main categories of business and public records data: building permits from around the Northwest, an archive of Washington business licenses, real estate and credit records (top property sales, foreclosures, liens, and contract acceptances), and legal and public notices. Most of this sits behind a subscription or sign-in, so treat the site as a paid records and leads service rather than a free public database. The free weekly newsletter is the main no-cost entry point.

Building Permits

The site maintains a building permits section described as "listings of building permits from around the Northwest." For contractors, suppliers, and developers, this is the most actionable dataset: a permit listing signals a project that has cleared the local approval stage and is likely to need labor and materials soon.

What to expect:

  • Permit listings organized as a browsable section rather than a single searchable public register.
  • Coverage framed as regional (Northwest), not limited to the city of Seattle.
  • Practical use: scan for project type and location, then cross-reference the firm or owner through the site's firm directory or bid center.

Washington Business Licenses

DJC.com offers "complete archives of WA Business Licenses." This is a historical archive, which matters for how you use it:

  • Good for: verifying that a firm exists, checking when a business appears in state records, and backgrounding a subcontractor or competitor.
  • Not good for: confirming current license status in real time. An archive shows what was published, not necessarily today's standing. For active status, verify with the state licensing authority.

Real Estate and Credit Records

Under its Real Estate/Credit section, the site lists:

Record type What it typically tells you
Top property sales Notable transactions, useful for market tracking and spotting active buyers
Foreclosures Distressed properties and the parties involved
Liens Claims filed against property or contractors
Contract acceptances Formal acceptance of contract terms on public work

These records are most useful as signals. A foreclosure or lien entry tells you something happened; it does not by itself establish the full legal picture. Confirm details against the underlying county or court record before relying on them for a business decision.

Legal and Public Notices

The site publishes legal notices, government notices, and city notices, and also lets firms place a notice in the DJC. Public notices are often the first formal signal of a project, a hearing, or a bid opportunity, so they pair naturally with the bid and RFP sections.

How to Access the Data

The homepage shows a sign-in prompt with a subscribe option, and the site runs a separate subscription page for the online edition, the newspaper, and plancenter.com. Access conditions:

  • Free: the weekly newsletter, subscribed to via the site's sign-up link.
  • Paid or account-based: the records sections and archives. The site does not publish prices on the pages reviewed, so confirm current terms on the subscription page before budgeting.
  • Plancenter.com: a related service for plans and specifications on Pacific Northwest projects, with a function to add your firm as a planholder and upload plans.

Practical Limits to Keep in Mind

  • Records are published for the journal's readership, not as an official government register. For permits, licenses, liens, and foreclosures, the county, state, or court record is the authoritative source.
  • The archive framing on business licenses means currency is not guaranteed.
  • Coverage is regional; a project outside the Northwest may not appear.

If your goal is finding bid opportunities rather than records, the permits, notices, and bid center sections overlap heavily, and starting with the bid calendar and today's bid results will usually be faster than working backward from permits.

What Is Seattle DJC.com and What Information Does It Provide?

Seattle DJC.com is a local business news and data site for the Pacific Northwest, with a strong focus on construction, real estate, and public contracting. It combines news coverage with practical project data: bid and RFP listings, building permits, firm directories, planholder rosters, and property records. It serves contractors, subcontractors, architects and engineers, suppliers, and real estate professionals who need to find work, track competitors, or follow regional development. Some content requires a subscription or sign-in, while a free weekly newsletter is also offered.

What the site covers

The homepage organizes content into industry sections, each with its own news and data tools:

Section What you'll find
Business Events, people moves, business licenses, bidding/RFP center, firm listings
Construction Bid calendar, bid results, sub-bid requests, building permits, rosters, project of the week, upcoming projects
Real Estate/Credit Top property sales, foreclosures, liens, contract acceptances
Environment Bids and RFPs, federal projects, firm directory
Tech Bids and RFPs, firm directory
Money Money-related news
Weekend Lifestyle/feature content

A "Special Sections" area lists recent publications and an editorial calendar for upcoming 2026 sections.

The data tools that matter most

The site's practical value is in its project and bidding data rather than the news alone:

  • Bid Center — today's bid results, sub-bids requested, bid calendar, and upcoming projects.
  • Plancenter.com — plans and specifications for Pacific Northwest projects, with a function to add your firm as a planholder and upload plans.
  • Building Permits — permit listings from around the Northwest.
  • Firm Directory — consultants and contractors operating in the region.
  • Public notices — legal, government, and city notices, plus a service to publish your own notice.
  • Resource Center — construction bids, IFBs, RFPs, rosters, and awards, plus consultant services (A&E bids, RFPs, SOQs) and miscellaneous goods and services.

Recent homepage examples show the format: an RFQ for Ballard Link extension civil engineering design services in Seattle, and awarded contracts such as a $5.64 million remedial action in Tacoma and a $13.19 million bridge project in Oregon, each attributed to a named contractor.

Who it's for

  • General contractors and subcontractors tracking bid opportunities, results, and competitors' wins.
  • Architects and engineers watching A&E RFPs, SOQs, and rosters.
  • Suppliers and specialty firms monitoring permits and upcoming projects for early leads.
  • Real estate and credit professionals following property sales, foreclosures, and liens.
  • Anyone needing public notice placement in the region.

Access and cost

The homepage prompts visitors to "sign in or click here to subscribe," and the site lists DJC Subscriptions (online, newspaper, or plancenter.com) with a subscribe/renew page. A separate free weekly newsletter is available via a sign-up link. The available information does not state specific prices or whether every section is gated, so check the subscription page for current terms before relying on access.

How to start using it

  1. Open djc.com and scan the section menu for your industry (e.g., Construction → Bid Center).
  2. Check "Today's bid results" and "Upcoming Projects" to gauge near-term opportunities.
  3. If you need plans and specs, go to Plancenter.com and register your firm as a planholder.
  4. Use the Firm Directory to research contractors or consultants before teaming or bidding.
  5. Subscribe to the free weekly newsletter to get highlights without a full subscription.
  6. If you need full archives or gated data, review the subscription options first.

A common snag: some listings sit behind a login, so confirm what your subscription tier includes before planning bid research around the site.

How Can a Firm Get Listed or Publish a Notice on Seattle DJC.com?

Seattle DJC.com offers several distinct routes for firms to get visibility: adding your firm as a planholder and uploading plans to the plan center, appearing in the firm directory, publishing legal or public notices, advertising, and ordering reprints. The right path depends on what you want to accomplish — being found as a bidder, reaching decision-makers with a message, or satisfying a legal publication requirement. Each route has its own entry point on the site, and the site does not publish prices or access terms for these services, so you will need to contact DJC directly to confirm cost and eligibility before committing.

Adding Your Firm as a Planholder and Uploading Plans

This is the route for firms that want to be visible as an interested bidder on a specific project, or that want to distribute plans and specifications to subcontractors and suppliers.

What it does: The plan center (plancenter.com) hosts plans and specifications for Pacific Northwest projects. Adding your firm as a planholder signals your interest in a project; uploading a plan makes your documents available to others browsing that project.

Steps:

  1. Go to the plan functions page on djc.com (linked from the site as "Plans — Add your firm as a planholder. Upload a plan to plancenter").
  2. Identify the project you are bidding or distributing plans for.
  3. Register your firm as a planholder on that project.
  4. Upload your plan documents to the plan center.

Expected result: Your firm appears on the planholder roster for that project, and your plans are accessible through the plan center.

Common sticking point: Planholder status is project-specific, not a general directory listing. If your goal is ongoing visibility rather than participation in one bid, the firm directory is the better route.

Getting Into the Firm Directory

The site maintains a firm directory described as "The Northwest's top Consultants and Contractors," with separate directory sections under Construction, Environment, and Tech, plus an A & E (architecture and engineering) people and firms section.

Who it suits: Contractors and consultants who want to be found by project owners, prime contractors, and others searching for teaming partners or subcontractors — independent of any single bid.

What to do: Use the "Contact Us" channel on the site (listed with phone, email, and directions) to ask about directory inclusion requirements. The site does not publish the criteria or fees for directory listings, so confirm both before planning around it.

Verification: After any listing is arranged, search the directory for your firm name to confirm it appears in the correct category.

Publishing Legal and Public Notices

DJC publishes legal notices, government notices, and city notices, and offers a "Publish a Notice" service for placing them.

Who needs this: Firms and agencies with notice publication requirements — call for bids, foreclosure notices, lien notices, and similar public notices that must run in a designated newspaper of record.

Steps:

  1. Go to the "Publish a Notice" entry under DJC Services.
  2. Submit your notice text through the provided channel.
  3. Confirm the publication date and format with DJC staff.

What to check first: Whether DJC is an accepted publication for your specific notice type and jurisdiction. That is a legal question about your notice's requirements, not something the site's listing pages answer — verify with the authority requiring the notice.

Advertising and Reprints

Two further options reach DJC's business audience:

  • Advertising: The site invites businesses to "market your business to decision makers around the Northwest." Use the Advertise link to inquire about formats and rates.
  • Reprints: If your firm was covered in DJC, you can order a reprint in hard copy, PDF, or linked HTML through the Reprints service.

These are message-distribution tools rather than directory or bid participation, so choose them when your goal is promotion or reuse of coverage rather than being listed as a project participant.

Choosing the Right Route

Your goal Route Where to start
Be visible as a bidder on a specific project Planholder + plan upload Plans / plan functions page
Be found by owners and primes generally Firm directory Contact Us to ask about inclusion
Meet a legal publication requirement Publish a Notice DJC Services → Publish a Notice
Promote your business to the region Advertising Advertise link
Reuse coverage of your firm Reprints Reprints service

If you are unsure which applies, the Contact Us page lists phone, email, and directions for subscription and news questions — the fastest way to confirm which service fits your situation and what it costs.

How to Subscribe to Seattle DJC.com or Its Free Newsletter

Seattle DJC.com offers three paid subscription routes — online access, the print newspaper, and plancenter.com — plus a separate free weekly newsletter. To start, go to the "Subscribe / Renew" page linked from the site's DJC Subscriptions section; to get the newsletter only, use the "Subscribe to our Free Weekly Newsletter" link. The site does not publish prices on the pages reviewed here, so check the subscription page or contact the staff for current rates and terms.

Subscription Options

The site's subscription section describes three ways to subscribe or renew:

Option What it covers Where to start
DJC online Digital access to DJC content "Subscribe / Renew" page under DJC Subscriptions
Newspaper The print DJC newspaper Same "Subscribe / Renew" page
plancenter.com Plans and specifications for Pacific Northwest projects Same page, or the Plans area (add your firm as a planholder, upload a plan)

The subscription agreement page (linked as "Terms of Service") is worth reading before you pay, since it sets out the terms that apply to your subscription.

Free Weekly Newsletter

The newsletter is a separate, no-cost signup. Look for the link labeled "► Subscribe to our Free Weekly Newsletter" in the subscription area of the site; it leads to a signup form. This does not give you access to subscriber content — it is only the weekly email.

If You Have Questions or Need to Renew

The "Contact Us" section lists phone, email, and directions for news items or subscription questions. Use it if you need current pricing, want to switch between online and print, or have a problem with an existing subscription. The site also lists "Subscribe / Renew" as a single entry point, so returning subscribers can renew from the same page.

Common Sticking Points

  • Free vs. paid: The free newsletter signup and the paid subscriptions are different links. Signing up for the newsletter will not unlock subscriber-only pages.
  • Plancenter is separate: Adding your firm as a planholder or uploading a plan to plancenter.com is a distinct service from a news subscription; use the Plans links rather than the general subscribe page.
  • No listed prices: Because rates are not shown on the reviewed pages, confirm cost and terms through the subscription page or the contact details before committing.
How to Find Construction Bids and RFPs on Seattle DJC.com

Seattle DJC.com (the Daily Journal of Commerce) publishes construction bidding information for the Pacific Northwest, and you can reach most of it from the Bid Center area of the site. The main entry points are "Today's bid results," "Sub-Bids Requested," "Upcoming Projects," the "Bid Calendar," "Federal Projects," and the separate Plancenter.com service for plans and specifications. Some content, such as full project details and plancenter access, sits behind a subscription or planholder arrangement, so expect to sign in or subscribe for the complete record.

What the Bid Center Covers

The site organizes bidding information into several distinct listings, each aimed at a different stage of the process:

Section What you'll find there
Today's bid results Recent award results, often with winning firm and dollar amount
Sub-Bids Requested Opportunities posted by prime contractors seeking subcontractors
Upcoming Projects Projects expected to go out to bid
Bid Calendar Scheduled bid dates
Rosters Firms listed as planholders or bidders on projects
Federal Projects Federal-level solicitations and guidance
Consultant Services A&E bids, RFPs, and SOQs for design professionals
Misc. Goods and Services Non-construction bids, RFPs, and SOQs

The homepage excerpt shows the format of bid results, for example a project with a stated value and the awarded contractor, such as a bridge project at $13.19 million awarded to TW Clark Construction. That pattern — project, location, value, contractor — is what you can expect from the results listings.

Step-by-Step: Finding an Opportunity

  1. Start at the Bid Center. From the main navigation, open the Bid Center to see current bids, sub-bids, and RFPs in one place.
  2. Check "Upcoming Projects" and the "Bid Calendar" first if you're planning ahead. These tell you what's coming and when bids are due, so you can prepare rather than react.
  3. Review "Sub-Bids Requested" if you're a subcontractor or supplier. This is where primes post the trades they need.
  4. Use the Rosters to see which firms have registered as planholders on a project — useful for teaming and for gauging competition.
  5. For design work, go to Consultant Services (A&E bids, RFPs, SOQs). For non-construction procurement, use Misc. Goods and Services.
  6. For federal work, open Federal Projects, which lists federal solicitations and submission guidelines.
  7. For plans and specifications, use Plancenter.com. The site notes you can "add your firm as a planholder" and "upload a plan to plancenter." Plancenter is the DJC's separate service for Pacific Northwest plans and specs.

Expected result: after these steps you should have a shortlist of live opportunities with due dates, the contracting entity, and — where plans are involved — a route to obtain the drawings and specs through Plancenter.

Access, Subscriptions, and What's Gated

The homepage greets visitors with "Welcome, sign in or click here to subscribe," which signals that at least part of the site requires an account. DJC offers subscriptions to the online edition, the newspaper, and Plancenter.com, and there is a separate free weekly newsletter you can sign up for. The subscription agreement page sets out terms of service.

Practical implication: the free newsletter and public listings give you a view of activity, but detailed bid documents, planholder status, and full plancenter access are tied to a paid subscription or planholder registration. The site does not publish prices on the pages referenced here, so confirm current rates through the Subscribe/Renew page before committing.

Common Stumbling Points

  • Confusing DJC listings with the official solicitation. The DJC aggregates and republishes notices; the authoritative bid documents and submission rules come from the issuing agency. Always confirm deadlines and requirements at the source.
  • Missing the planholder step. If you intend to bid, registering as a planholder on Plancenter is how you get on the roster and receive addenda. Bidding without registering risks missing updates.
  • Overlooking the consultant track. Architects and engineers often search only construction bids and miss the A&E RFPs and SOQs under Consultant Services.
  • Assuming everything is free. The sign-in prompt and subscription links indicate gated content; plan accordingly rather than discovering it at the document-download stage.

A Quick Decision Guide

  • General contractor seeking projects: Bid Center → Upcoming Projects and Bid Calendar → Plancenter for plans.
  • Subcontractor or supplier: Sub-Bids Requested and Rosters, plus the free weekly newsletter to stay alerted.
  • Design firm: Consultant Services for A&E RFPs and SOQs.
  • Federal contractor: Federal Projects, then follow the linked submission guidelines.
  • Researcher or marketer: Bid results and Top Property Sales for award and market data.

Used this way, DJC.com works as a regional opportunity board: scan the Bid Center for what's live, use the calendar and upcoming projects to plan, and route to Plancenter or the issuing agency for the documents you need to actually submit.

Website Overview

Identifiable technologies and additional version or configuration signals make the service easier to fingerprint, which may help targeted scanners narrow their checks. An established domain and managed infrastructure suggest continuity of operations and may support dependable delivery, although neither guarantees service quality.

Domain and Registration

Registered in 1994, this domain has about 32 years of history. That suggests continuity, although ownership and purpose may have changed. Transfer-protection status is present, helping reduce the risk of unauthorized domain transfers. The domain uses the common .com extension, which is not an independent safety signal.

DNS and Email

The observed email authentication setup is incomplete: DMARC is missing. Nameservers are provided by easydns.com, indicating managed DNS hosting. MX records point to the Microsoft 365 email service. No CNAME was found; the observed records resolve directly to addresses. TXT records include verification markers for Microsoft. Such markers may also remain after a service stops being used.

TLS and Certificates

The certificate issuer is DigiCert Inc, a commercial certificate authority. The certificate uses an RSA 2048-bit public key, offering broad client compatibility. The server supplied a complete certificate chain. No organization name is present in the certificate; the available fields are consistent with domain validation. The certificate is valid for about 198 days in total, with 95 days remaining.

HTTP and Browser Security

The Server header exposes the software version: Apache/2.4.29 (Ubuntu). This makes version-targeted checks easier, but is not proof of an exploitable vulnerability. The response lacks these common security headers: CSP, X-Content-Type-Options, Referrer-Policy, Permissions-Policy, clickjacking protection. No X-Powered-By header was found, reducing one common source of backend fingerprinting information. No obvious internal addresses or debug information were found in the headers. Cookie security attributes are unknown.

Technology Stack Analysis

The public page identifies Apache 2.4.29, with exact versions exposed for 1 technologies. These details can narrow vulnerability checks, although exposure alone is not a vulnerability.

Search and Social Sharing

No homepage meta description was detected, leaving snippet selection more dependent on page text. No viewport meta tag was detected, which may affect mobile layout behavior. No homepage canonical URL was detected. If duplicate URLs exist, consolidation may be less explicit. No Open Graph metadata was detected, so social previews may depend on platform inference. The title has 44 characters, within a common display range.

Hosting and Email

DNSeasydns.com
HostingLevel 3 Parent, LLC
EmailMicrosoft 365
Approximate IP geolocation (inferred; a CDN or proxy may differ from the origin server) United States flagSeattle, Washington, United States Inferred 65.57.72.51

Registration details

RDAP / WHOIS

RegistrareasyDNS Technologies Inc.
Registered1994-09-08
Expires2031-09-07
Domain statusclient transfer prohibited、client update prohibited
Nameserversdns1.easydns.com、dns2.easydns.net
DNSSECunsigned

DNS records

DNS

TypeNameValueTTLPriority
Awww.djc.com65.57.72.512822—
MXdjc.comdjc-com.mail.protection.outlook.com360020
NSdjc.comdns1.easydns.com3600—
NSdjc.comdns2.easydns.net3600—
NSdjc.comdns3.easydns.org3600—
TXTdjc.com090320213600—
TXTdjc.com828pkx4clv5yng3079v7sxqwqscdby5z3600—
TXTdjc.comMS=ms988448483600—
TXTdjc.com_1yod5hboaj2s5sosdce2eup2mkvbgxi3600—
TXTdjc.com_vt21sxbbrd457qh3higfarwof7qo6523600—
TXTdjc.comc7j8xcghks4ffzkn67xpl04qq75jh1j73600—
TXTdjc.comhave-i-been-pwned-verification=dweb_v7e07mrzk64f9xldvaixbyek3600—
TXTdjc.comm993cky3bjnyb425tj6cvclrsv9dzwm13600—
TXTdjc.comv=spf1 include:spf.protection.outlook.com -all3600—

TLS and certificates

TLS / SSL

AssessmentNormal configuration
Supported protocolsTLSv1.2
Negotiated protocolTLSv1.2
Certificate subject*.djc.com
IssuerDigiCert Inc
Valid until2027-01-21T23:59 · Remaining when checked: 95 days
Verification detailsCertificate trust: Passed · Hostname match: Passed

HTTP response headers

HTTP

HeaderValue
content-typetext/html; charset=utf-8
cache-controlno-store, no-cache, must-revalidate
serverApache/2.4.29 (Ubuntu)
strict-transport-securitymax-age=60; includeSubDomains;
set-cookieRedacted

Identified technologies

Apache 2.4.29

Pages, Search and Sharing

Meta descriptionNot detected
Canonical URLNot detected
LanguageEnglish (default)
Twitter CardNot detected

Unknown

boardreader 0 allowed · 1 disallowed
  • Disallow/
boardtracker 0 allowed · 1 disallowed
  • Disallow/
gigabot 0 allowed · 1 disallowed
  • Disallow/
twiceler 0 allowed · 1 disallowed
  • Disallow/
dotbot 0 allowed · 1 disallowed
  • Disallow/
baidu 0 allowed · 1 disallowed
  • Disallow/
baiduspider 0 allowed · 1 disallowed
  • Disallow/
baiduspider-video 0 allowed · 1 disallowed
  • Disallow/
baiduspider-image 0 allowed · 1 disallowed
  • Disallow/
naverbot 0 allowed · 1 disallowed
  • Disallow/
sosospider 0 allowed · 1 disallowed
  • Disallow/
yandex 0 allowed · 1 disallowed
  • Disallow/
youdaobot 0 allowed · 1 disallowed
  • Disallow/
yeti 0 allowed · 1 disallowed
  • Disallow/
proximic 0 allowed · 1 disallowed
  • Disallow/
sogou 0 allowed · 1 disallowed
  • Disallow/
heretrix 0 allowed · 1 disallowed
  • Disallow/
sogou spider 0 allowed · 1 disallowed
  • Disallow/
sogou web spider 0 allowed · 1 disallowed
  • Disallow/
mj12bot 0 allowed · 1 disallowed
  • Disallow/
All bots 0 allowed · 25 disallowed
  • Disallow/Ads
  • Disallow/ppv
  • Disallow/cust/openx/
  • Disallow/credit/
  • Disallow/no/
  • Disallow/notices/
  • Disallow/func/
  • Disallow/cust/
  • Disallow/*/firms.html
  • Disallow/*/wanted.html
  • Disallow/firms/
  • Disallow/co/wanted.html
  • Disallow/bu/wanted.html
  • Disallow/ae/wanted.html
  • Disallow/re/wanted.html
  • Disallow/tech/wanted.html
  • Disallow/en/wanted.html
  • Disallow/le/wanted.html
  • Disallow/co/firms.html
  • Disallow/bu/firms.html
  • Disallow/ae/firms.html
  • Disallow/re/firms.html
  • Disallow/tech/firms.html
  • Disallow/en/firms.html
  • Disallow/le/firms.html
  • IntervalCrawl delay 5 seconds

No sitemaps found

User reviews (0)

  • No reviews yet.