Website profiles · Technology insights · Alternatives

cemarkit.co.uk

CE Marking consultants and PUWER compliance consultants. Specialists in CE Marking, we provide expert services to assist you with all aspects of CE Marking and PUWER compliance of your machines

No paid content found
Visit website
Profile views 7 Outbound visits 1 Normal
CEmarkit Full homepage screenshot

At a glance

Category
Business Services
Language
English
Paid-content signal
No paid content foundObserved
Registered
2002
Hosting
Heart Internet limitedInferred
HTTPS certificate trusted
FailedObserved
Last updated

Website review

This review may include AI-generated content and is not individually verified. Domain, certificate and other facts come from the observed data on this page.

What is CEmarkit?

CEmarkit is a small professional engineering consultancy that specialises in CE Marking and PUWER compliance for machinery and work equipment. It is aimed at manufacturers, importers and employers who need to place equipment on the European market or ensure it is safe for use at work but lack the time or in-house resources to handle the compliance work themselves. According to the site, the firm was established in 2000 and has helped over 200 manufacturers and importers worldwide.

Its two main service areas are:

  • CE Marking — conducting CE marking assessments and compiling the Technical File for equipment or machines before they are sold in Europe.
  • PUWER compliance — conducting PUWER compliance assessments or pre-purchase safety audits, helping employers and suppliers confirm equipment is suitable for its purpose and maintained in a safe condition.

The practical distinction is between bringing a product to market and keeping it safe once in use. A manufacturer launching a new machine in the EU would typically need CE marking support, while a company buying or operating work equipment would lean toward the PUWER assessment or pre-purchase audit.

If you are weighing whether to engage them, start by identifying which side of that line you are on and gather your existing technical documentation, risk assessments and equipment records before making contact. For official definitions of the underlying rules, see European Commission and HSE.

How do I know if my machinery needs CE marking before selling it in the UK or Europe?

You need CE marking when your machine is being placed on the market in Great Britain or the EU and it falls within the scope of a relevant product safety law. In practice, that means you are the manufacturer, importer or someone presenting the machine as your own, and the machine is new to the market there. If you are only an end user putting a machine into service in your own workplace, CE marking is not the usual question — PUWER compliance is.

CEmarkit describes itself as a small engineering consultancy, established in 2000, that has helped over 200 manufacturers and importers with CE marking and PUWER work. Its page evidence shows two distinct services: CE marking assessments and Technical File compilation, and PUWER compliance assessments or pre-purchase safety audits. That split is the clearest clue to the deciding factor.

The practical decision path

  1. Identify the machine and its intended use. A standard industrial machine, a partly completed machine, or a machine you have modified can fall into different categories.
  2. Check which law applies in the destination market. Great Britain and the EU now operate separate but closely related machinery safety regimes. A machine that complies for one market is not automatically documented for the other.
  3. Decide whether you are placing it on the market or using it at work. Selling, importing, or first making available points to CE marking. Using equipment in your own workplace points to PUWER.
  4. Ask whether the machine is complete or partly completed. A partly completed machine is generally not CE marked in the same way as a finished machine; it comes with a declaration of conformity for incorporation instead. This is a common trap for buyers and sellers of custom-built lines.

A concrete scenario

A small UK integrator buys a used packaging line from Germany, refurbishes it and sells it to a UK food manufacturer. Because the integrator is placing the refurbished machine on the GB market, it is normally treated as the manufacturer for that machine. That means assessing it against the applicable supply regulations, compiling a technical file, and issuing a declaration. The food manufacturer, by contrast, needs PUWER compliance for its own staff using the line. CEmarkit's two service lines map onto these two roles.

Comparison

Situation Usual focus Typical output
You build or import machines and sell them CE marking Assessment, Technical File, declaration
You buy a machine for your own site PUWER Suitability and safe-condition assessment
You are buying a second-hand machine Pre-purchase safety audit Risk picture before you commit
You supply a partly completed machine Incorporation declaration Documentation for the final assembler

Where to get a firm answer

The legal text, not a consultant's summary, decides scope. The EU Machinery Regulation and the GB Supply of Machinery (Safety) Regulations set out what counts. For official guidance, see GOV.UK and European Commission. For an independent view of machinery safety practice, the Health and Safety Executive covers PUWER duties for work equipment.

A sensible next step is to write a one-page description of the machine: what it does, who you are in the chain, where it will be sold, and whether it is complete. Send that to a consultancy and ask for a scope opinion before commissioning a full Technical File. That keeps the early cost proportional to the risk.

What is the difference between CE marking and PUWER compliance for work equipment?

CE marking and PUWER compliance address different stages and duties in the life of work equipment. CE marking is a pre-market conformity process: the manufacturer or importer assesses the machine against applicable EU directives and regulations, compiles a technical file, and affixes the mark before selling it in Europe. PUWER is a use-in-work duty: employers and suppliers must ensure equipment is suitable for its purpose and kept in a safe condition throughout its working life.

CEmarkit describes itself as a small engineering consultancy established in 2000, working on both sides of this split — CE marking assessments and technical file compilation, plus PUWER compliance assessments and pre-purchase safety audits.

CE marking PUWER compliance
Trigger Placing equipment on the EU market Using or supplying equipment for work
Main duty holder Manufacturer or importer Employer or supplier
Typical output Technical file, declaration, mark Assessment, safe-condition checks, audit
Timing Before sale Before and during use

A practical example: a machine builder buys a used press. Before resale in the EU, it needs CE marking work — risk assessment, technical file, correct marking. The buyer who then puts that press into a workshop needs PUWER checks: guards, controls, emergency stops, maintenance and training. The same machine can need both, at different moments and by different people.

For a decision criterion, ask who is acting and when. If you are selling or importing into the EU, start with CE marking. If you are buying, installing or operating equipment at work, start with PUWER. If both apply, sequence them: resolve CE marking first so the equipment is placed on the market correctly, then confirm PUWER suitability before it is used. CEmarkit's pre-purchase safety audit service fits the second stage, giving a buyer evidence before committing to used equipment. For official guidance on the underlying rules, see European Union and HSE.

What does a PUWER pre-purchase safety audit involve and when should I request one?

A PUWER pre-purchase safety audit is an independent check of a machine or item of work equipment before you buy it, hire it or take it into service. Rather than assessing equipment you already own, it asks a simple question early: if we acquire this, can we make and keep it safe and compliant for its intended use? CEmarkit describes itself as a small engineering consultancy offering PUWER compliance assessments and pre-purchase safety audits, so the service sits alongside, but is distinct from, CE marking work.

What the audit typically covers

  • Intended use and suitability — whether the equipment is appropriate for the task, the environment and the people who will operate it.
  • Guarding and access — guarding of dangerous parts, emergency stops, isolation and lock-off points, and safe access for maintenance and cleaning.
  • Controls and information — control layout, markings, warnings, and whether instructions and a declaration of conformity or CE documentation exist and match the machine.
  • Residual risks and gaps — anything that would need modification, extra guarding, training or a change of process before the equipment is safe to use.
  • Findings and actions — a written picture of what is compliant, what is not, and roughly what it would take to close the gaps.

When to request one

  • Before committing to a purchase, especially of used, imported or custom-built machinery where documentation may be incomplete.
  • Before signing a hire or lease, so remedial costs are known and can be priced into the deal or pushed back to the supplier.
  • When buying at auction or from a dealer where you cannot inspect thoroughly or verify history.
  • When the equipment will be used differently from its original purpose, or by different operators.
  • When you need evidence for your own PUWER duties as an employer or supplier of equipment for use at work.

A practical way to decide

Situation Audit worthwhile?
New machine from a reputable EU supplier with full CE documentation Usually low priority; verify paperwork instead
Used machine, unclear history, no technical file Strongly recommended
Machine to be modified or repurposed Strongly recommended
High-risk process (presses, conveyors, woodworking, lifting) Strongly recommended
Low-risk, simple, well-documented equipment Depends on cost and consequence of failure

As a next step, list the machine's intended use, who will operate it, and what documentation the seller can provide. If any of those are unclear, that is the moment to commission an audit — the cost is usually far smaller than retrofitting guarding or defending an incident after the equipment is installed.

What documents and steps are required to compile a CE marking technical file for a machine?

A CE marking technical file is the evidence package that shows a machine meets the applicable EU health and safety requirements. For machinery, the core legal framework is the Machinery Directive/Regulation, supported by standards such as EN ISO 12100 for risk assessment and EN 60204-1 for electrical safety. The file must be compiled before the Declaration of Conformity is signed and the CE mark is affixed.

Typical contents of a machinery technical file

  • Technical drawings and diagrams — general arrangement, electrical, hydraulic and pneumatic schematics, plus relevant control diagrams.
  • Risk assessment — systematic identification of hazards, risk estimation and the protective measures applied, ideally following EN ISO 12100.
  • Compliance route and standards list — the harmonised standards applied, fully, partly or not at all, with reasons for any deviations.
  • Description of protective measures — guards, interlocks, emergency stops, safe distances, and how they address each significant risk.
  • Component evidence — declarations of conformity or certificates for bought-in safety components and assemblies.
  • Test reports and calculations — noise, vibration, stability, strength, electrical safety and functional safety data where relevant.
  • Operating instructions — original language plus translations for each target market, covering intended use, residual risks and maintenance.
  • Declaration of Conformity — signed by the responsible person, listing the machine, the legislation and the standards applied.
  • Traceability records — serial numbers, production dates, and the identity of the person who compiled and authorised the file.

Practical sequence

  1. Define the machine and its limits — intended use, reasonably foreseeable misuse, space, time, energy and environmental limits.
  2. Carry out the risk assessment — identify hazards, estimate risk, reduce risk by design, then by safeguarding, then by information for users.
  3. Select and apply standards — choose the A, B and C-type standards relevant to the machine type and record how each is applied.
  4. Design and verify protective measures — confirm guarding, control systems, stopping performance and ergonomics against the assessment.
  5. Assemble the technical documentation — drawings, calculations, component declarations, test results and instructions.
  6. Draft and sign the Declaration of Conformity — only once the file demonstrates compliance.
  7. Affix the CE mark — visibly, legibly and indelibly on the machine, and keep the file available for authorities for the required retention period.

A realistic reader scenario

A small manufacturer builds a conveyorised packing line for sale in Germany and France. The engineering team knows the mechanics but has no in-house compliance specialist. They start with a risk assessment, discover that the interlocked guard does not meet the required safe distance, redesign it, then gather component declarations and electrical test results. The technical file becomes the single place where drawings, standards choices and test evidence live, so the Declaration of Conformity is supported rather than merely asserted.

When to bring in outside help

If your team lacks the time, the standards knowledge, or the ability to interpret the applicable legislation, a specialist consultancy can conduct the assessment and compile the technical file. CEmarkit describes itself as a small engineering consultancy, established in 2000, providing CE marking and PUWER compliance services, including compiling technical files and conducting pre-purchase safety audits. That kind of support is most useful when you need an independent assessment, a second opinion on standards selection, or help producing a file that will withstand scrutiny from a market surveillance authority.

A sensible next step is to list every document you already hold, mark the gaps against the contents above, and decide whether the remaining work is a short internal project or a task better handled with external expertise.

How much does it cost to hire a CE marking or PUWER consultant, and how long does the process take?

Costs and timelines for CE marking or PUWER consulting depend almost entirely on the machine, not on a fixed rate card. A single, standard machine with an existing technical file might take a few days of consultancy; a complex assembly, a production line, or a product involving several EU directives can run to weeks or months of engineering work. Most consultancies quote per project after a scoping review, because the variable is the engineering effort required, not the consultant's hourly rate alone.

CEmarkit describes itself as a small professional engineering consultancy, established in 2000, that has helped over 200 manufacturers and importers. Its stated services are CE marking assessments, compiling the Technical File, PUWER compliance assessments, and pre-purchase safety audits. It does not publish prices, so you would need to request a quote.

H3 What drives the cost

  • Number and type of machines, and whether they are similar enough to share one assessment.
  • Whether you already have a technical file, risk assessment and drawings, or the consultant must produce them.
  • Which directives apply (for example machinery, EMC, low voltage) and whether a Notified Body is required for your category.
  • How much of the work you do in-house versus outsourcing.
  • For PUWER: whether it is a one-off compliance assessment, a pre-purchase audit, or ongoing support across a fleet of equipment.

H3 What drives the timeline

  • Availability of your documentation: missing drawings or manuals are the most common cause of delay.
  • Whether design changes are needed after the risk assessment, which resets part of the process.
  • Testing and, where relevant, Notified Body involvement, which adds external lead time you cannot compress.
  • Your own review and sign-off speed.

H3 How to compare consultants

What to ask Why it matters
Fixed price or time-and-materials? Fixed price shifts risk to the consultant but usually assumes a clear scope
What is included? Assessment only, or assessment plus Technical File, drawings and declaration
Who signs the Declaration of Conformity? Responsibility stays with you as manufacturer or importer
What happens if the scope grows? Agree a change-control rate before starting
Do they do PUWER as well as CE marking? One supplier for both can reduce duplicated site visits

A practical next step: write a one-page brief listing each machine, its function, the market it will be sold into, and what documentation already exists. Send that to two or three consultancies and ask for a scoped quote with an estimated number of days. That brief is what turns a vague "it depends" into a comparable number, and it also tells you quickly whether a consultant understands your equipment.

Related questions

More questions →
What Is PUWER Compliance and How Does It Differ from CE Marking?

PUWER compliance is about work equipment being suitable for its purpose and maintained in a safe condition for use at work; CE marking is about meeting the requirements to place machinery on the market in Europe. They can apply to the same machine at different points in its life, so the practical question is usually not "which one?" but "which one applies now, and who is responsible?"

What PUWER requires

PUWER stands for the Provision and Use of Work Equipment Regulations. According to CEmarkit, employers and suppliers of equipment for use at work must ensure it meets PUWER — that it is suitable for its purpose and maintained in a safe condition.

The core duties sit with the employer using the equipment, and cover:

  • Suitability — the equipment is right for the job and the conditions it is used in.
  • Safe condition — it is maintained so it stays safe throughout its working life.
  • Maintenance and inspection — checks are carried out as needed, with records where required.
  • Information and training — people who use, supervise, or maintain the equipment know how to do so safely.

Because PUWER is about use, it applies to equipment already in service, including second-hand machines and equipment that was never CE marked.

What CE marking requires

CE marking applies when machinery or equipment is placed on the market in Europe. CEmarkit notes that most companies know they need to do something about CE marking before selling in Europe, but many lack the time or resources to complete the work.

The CE marking process for machinery typically involves:

  • Identifying the applicable regulations and standards.
  • Carrying out a conformity assessment, including risk assessment.
  • Compiling a Technical File.
  • Drawing up the Declaration of Conformity and affixing the CE mark.

CEmarkit states it can conduct CE marking assessments and compile the Technical File on a client's behalf.

PUWER vs CE marking: the key differences

PUWER CE marking
Focus Safe use of work equipment Placing equipment on the market in Europe
Who is responsible Employers and suppliers of equipment for use at work Manufacturers and importers bringing equipment to market
When it applies While the equipment is in use at work Before sale/placing on the market
Main output Suitable, maintained, safely used equipment Technical File, Declaration of Conformity, CE mark

The two regimes overlap but are not substitutes. A machine can be correctly CE marked and still fail PUWER if it is unsuitable for the specific task, poorly maintained, or used without adequate training. Equally, equipment already in service may need PUWER compliance even if CE marking never applied to it.

What a PUWER assessment or pre-purchase audit involves

CEmarkit describes two related services:

  • PUWER compliance assessments — reviewing equipment against the PUWER duties so the employer knows what needs correcting.
  • Pre-purchase safety audits — assessing equipment before it is bought, so safety problems are identified before the employer takes on responsibility for it.

A pre-purchase audit is particularly useful when buying second-hand machinery, where the CE marking history may be unclear and the equipment still has to be safe for use.

When both apply to the same machine

Both can apply when you buy machinery for use at work:

  1. At purchase — the supplier or manufacturer deals with CE marking; you can use a pre-purchase safety audit to check the equipment before committing.
  2. In service — as the employer, you are responsible for PUWER: suitability, maintenance, inspection, and training.

If you are a manufacturer or importer, CE marking is your route. If you are an employer putting equipment to work, PUWER is your route. If you do both, you need both — and CEmarkit positions itself as covering both sides as a product safety and CE marking consultancy established in 2000, having worked with over 200 manufacturers and importers worldwide.

If you are unsure which applies to your situation, the deciding questions are: Is this equipment being placed on the market, or is it being used at work? and Am I the manufacturer/importer, or the employer? Your answers point to the compliance route — and often to both.

What Is CE Marking and What Does It Require?

CE marking is the visible declaration that a product meets the applicable European Union health, safety, and environmental requirements, allowing it to be legally placed on the EU/EEA market. It applies to many product categories, but for machinery and work equipment the core obligations are: identify the applicable directives or regulations, carry out a risk assessment, meet the relevant harmonised standards, compile a technical file, issue an EU Declaration of Conformity, and affix the CE mark. A Notified Body is only required where the applicable legislation says so. The steps below explain what that means in practice, using machinery as the main example.

Which products need CE marking?

CE marking is not voluntary and not universal. It applies only to products covered by one or more EU directives or regulations that require it. Common categories include:

  • Machinery and safety components
  • Electrical and electronic equipment
  • Pressure equipment
  • Medical devices
  • Toys
  • Construction products
  • Personal protective equipment

For machinery, the starting point is the Machinery Regulation/Directive. Other legislation may also apply depending on the product — for example electrical safety, electromagnetic compatibility, or outdoor noise. A machine can fall under several pieces of legislation at once, and all applicable ones must be satisfied.

If no directive or regulation requires CE marking for your product, you do not CE mark it.

The core steps to CE mark machinery

1. Determine the applicable legislation and the product's classification

Identify every directive or regulation that applies to the machine. Then check whether the machine is "ordinary" or falls into a category listed in the machinery legislation as requiring a Notified Body (for example certain presses, woodworking machines, or machinery with specific safety-critical functions).

2. Carry out a risk assessment

The risk assessment is the foundation of the whole process. It identifies hazards, estimates risk, and records the protective measures taken. It should cover the whole lifecycle: assembly, operation, adjustment, maintenance, and reasonably foreseeable misuse.

3. Apply harmonised standards

Harmonised standards give a presumption of conformity with the essential health and safety requirements. Applying them is the most straightforward route, but you must confirm the standard actually covers your machine and its hazards. Where no standard exists, you must demonstrate conformity by other means.

4. Build the technical file

The technical file is the evidence pack that shows how conformity was achieved. It typically includes:

  • Description of the machine and its intended use
  • Drawings, schematics, and circuit diagrams
  • Risk assessment
  • List of applicable standards and how they were applied
  • Test reports or calculations
  • Instructions for use
  • Declaration of Conformity

The file must be kept available for the authorities, generally for ten years after the last unit is placed on the market.

5. Involve a Notified Body where required

For machinery categories listed in the legislation as requiring third-party involvement, a Notified Body must carry out the relevant conformity assessment procedure. For most ordinary machinery, self-assessment by the manufacturer is sufficient and no Notified Body is needed.

6. Issue the EU Declaration of Conformity

The Declaration of Conformity is a legal document in which the manufacturer takes sole responsibility for conformity. It must identify the manufacturer, the product, the applicable legislation, any standards used, and any Notified Body involved. It must be signed and dated.

7. Affix the CE mark

The CE mark must be:

  • Affixed visibly, legibly, and indelibly
  • Placed on the product, or on its data plate, or on the packaging where that is not possible
  • At least 5 mm high (unless a specific directive says otherwise)
  • Accompanied by the Notified Body's identification number where one was involved

8. Maintain compliance after the sale

CE marking is not a one-off event. If the machine is modified in a way that affects conformity, the assessment must be revisited. Records must be retained, and the Declaration of Conformity must stay accurate.

CE marking vs PUWER: two different obligations

It is easy to confuse CE marking with PUWER compliance, but they address different stages and different parties.

Aspect CE Marking PUWER
Applies to Products being placed on the EU/EEA market Work equipment used by employees
Main duty holder Manufacturer or importer Employer or supplier of equipment for use at work
Core requirement Meet applicable EU directives/regulations Equipment suitable for purpose and maintained in a safe condition
Timing Before sale or first placing on the market Throughout the equipment's working life
Typical output Technical file and Declaration of Conformity Compliance assessment or pre-purchase safety audit

A machine can be correctly CE marked and still fail PUWER if it is not suitable for the specific workplace task or is not maintained safely. Conversely, PUWER compliance does not replace the need for CE marking.

Common mistakes and consequences

  • Assuming all products need CE marking. Only products covered by the relevant legislation do.
  • Treating the technical file as a formality. It is the evidence base; a weak file is the most common reason for problems during market surveillance.
  • Ignoring standards that apply. Missing an applicable standard can leave essential requirements unmet.
  • Using a Notified Body when not required, or not using one when required. Both create legal risk.
  • Failing to update the assessment after modification. Changes to the machine can invalidate the original conformity.
  • Confusing CE marking with PUWER. They are separate legal regimes with separate duties.

Non-compliance can lead to the product being withdrawn from the market, restrictions on sale, and penalties under national law. The exact consequences depend on the member state and the nature of the breach.

When to get specialist help

If you are a manufacturer or importer with limited in-house resources, or if your machine falls into a category requiring a Notified Body, an engineering consultancy can carry out the assessment and compile the technical file on your behalf. The same applies to PUWER: assessments and pre-purchase safety audits can be conducted for employers and suppliers who need to demonstrate that equipment is suitable and safe for use at work.

The practical decision is straightforward: confirm which legislation applies, check whether a Notified Body is needed, and make sure the technical file and Declaration of Conformity are complete before the product is placed on the market.

Website Overview

Identifiable technologies and additional version or configuration signals make the service easier to fingerprint, which may help targeted scanners narrow their checks. An established domain and managed infrastructure suggest continuity of operations and may support dependable delivery, although neither guarantees service quality.

Domain and Registration

Registered in 2002, this domain has about 23 years of history. That suggests continuity, although ownership and purpose may have changed. Registration contact information is publicly available through RDAP. The domain uses the common .uk extension, which is not an independent safety signal.

DNS and Email

MX records exist, but SPF, DKIM and DMARC were not detected. Protection against domain impersonation may be incomplete. Nameservers are provided by heartinternet.uk, indicating managed DNS hosting. MX records point to the cemarkit.co.uk email service. No CNAME was found; the observed records resolve directly to addresses. DNSSEC signatures were not detected, so this additional DNS authenticity protection is not confirmed.

TLS and Certificates

The certificate uses an RSA 2048-bit public key, offering broad client compatibility. The server supplied a complete certificate chain. No organization name is present in the certificate; the available fields are consistent with domain validation. The certificate is valid for about 198 days in total, with 11 days remaining. The SAN includes a wildcard covering multiple hostnames at the same subdomain level. Shared private keys can increase the impact of a compromise.

HTTP and Browser Security

X-Powered-By exposes backend information: PHP/5.6.40. The checked browser-security headers were not detected, leaving fewer explicit browser-side safeguards. No obvious internal addresses or debug information were found in the headers. The Server header identifies Apache without an exact version. No explicit CDN or WAF marker was found in the response headers.

Technology Stack Analysis

The public page identifies WordPress 3.9.40, jQuery, Apache, PHP, with exact versions exposed for 1 technologies. These details can narrow vulnerability checks, although exposure alone is not a vulnerability.

Search and Social Sharing

The title has 91 characters and may be truncated in search results. The meta description has 193 characters and may be shortened in search results. The Generator tag identifies WordPress 3.9.40, making the publishing system easier to fingerprint. Open Graph is partially configured; og:image is missing. The observed directives allow indexing and link following.

Hosting and Email

DNSheartinternet.uk
HostingHeart Internet limited
Emailcemarkit.co.uk
Approximate IP geolocation (inferred; a CDN or proxy may differ from the origin server) United Kingdom flagLeeds, United Kingdom Inferred 176.32.230.4

Registration details

RDAP / WHOIS

RegistrarHeart Internet Limited t/a Heart Internet
Registered2002-10-25
Expires2027-10-25
Domain statusactive
Nameserversns.heartinternet.uk、ns2.heartinternet.uk
DNSSECunsigned

DNS records

DNS

TypeNameValueTTLPriority
Awww.cemarkit.co.uk176.32.230.43600—
MXcemarkit.co.ukmail.cemarkit.co.uk360010
NScemarkit.co.ukns.heartinternet.uk3600—
NScemarkit.co.ukns2.heartinternet.uk3600—

TLS and certificates

TLS / SSL

AssessmentCertificate issue
Supported protocolsTLSv1.2、TLSv1.3
Negotiated protocolTLSv1.3
Certificate subject*.secure-secure.co.uk
IssuerPerfectSSL
Valid until2026-10-08T23:59 · Remaining when checked: 11 days
Verification detailsCertificate trust: Failed · Hostname match: Failed

HTTP response headers

HTTP

HeaderValue
content-typetext/html; charset=UTF-8
serverApache

Identified technologies

WordPress 3.9.40jQueryApachePHP

Pages, Search and Sharing

Meta descriptionCE Marking consultants and PUWER compliance consultants. Specialists in CE Marking, we provide expert services to assist you with all aspects of CE Marking and PUWER compliance of your machines
Canonical URLhttp://www.cemarkit.co.uk/
LanguageEnglish (default)
Twitter CardNot detected
All bots 0 allowed · 0 disallowed
  • IntervalCrawl delay 2 seconds

User reviews (0)

  • No reviews yet.